Dropped at you by way of Bulls N’ Bears
Doug Shiny
Aurum Assets’ newest assays from seven diamond drill holes punched into the BST1 goal at its Boundiali gold undertaking in Côte d’Ivoire have showed gold mineralisation extends to a vertical intensity of 220m beneath the present mineral useful resource.
The corporate’s standout deep intercept on the prospect delivered 29m at 1 gram in step with tonne (g/t) gold from 444m downhole intensity, together with an eyebrow-raising 1m at 18.14g/t gold. Any other hollow delivered 8m at 3.38g/t gold from 279m and featured 1m at a heady 22.80g/t gold.
The drilling has showed past doubt the BST1 machine stays open and keeps sturdy intensity endurance and strike possible.
Moreover, on the corporate’s BDT3 goal – 19 kilometres north of BST1 – an extra 10 diamond holes had been drilled on a 100 to 200m line spacing to check for intensity extensions.
‘This confirms that the BST1 machine stays open and has important intensity endurance within the recent rock.’
Aurum Assets managing director Dr Caigen Wang
Key intercepts from that program had been 7m at 1.23g/t gold from 352m, together with 3.58m at 2.05g/t gold. The intercept probed 50m deeper and vertically beneath the present decrease boundary of the BDT3 useful resource envelope.
A 2d intercept at BDT3 delivered 7.09m at 1.09g/t gold from 291m, together with 1.09m at 3.91g/t gold. As with its BST1 goal, the effects give a boost to the corporate’s view that the BDT3 mineralised machine additionally stays open at intensity and probably alongside strike.
The brand new effects have emerged from Aurum’s ongoing 100,000m diamond drilling program, which is aimed toward rising oz and toning up self belief forward of the corporate’s subsequent mineral useful resource replace, centered for Q3 CY2026.
Aurum Assets managing director Dr Caigen Wang mentioned: “Those new effects proceed to display the Boundiali machine has a possible gold endowment properly above our present Mineral Assets. At BST1, we’ve got showed intensity (220m beneath present MRE) and strike extensions.”
The assay effects from the BDT3 and BST1 drilling had been won after the time limit for his or her inclusion in Aurum’s fresh Boundiali mineral useful resource estimate replace. Alternatively, control says they are going to be integrated within the subsequent replace, slated for Q3 CY2026.
With more than one assets, deposits and objectives unfold throughout a sprawling 75km mineralised hall, Aurum now perspectives Boundiali as a possible hub-and-spoke operation, feeding a central processing facility from a pipeline of rising gold deposits. The concept that can be assessed as a part of Aurum’s upcoming pre-feasibility find out about due in Q2 CY2026.
Aurum not too long ago up to date Boundiali’s useful resource to 99.7 million tonnes grading 1g/t for three.03 million gold oz. The corporate has highlighted the project’s sturdy infrastructure, together with grid energy, roads and water, along its 3 mining licence packages, which it expects to be granted in Q3 CY2026.
Aurum’s mixed workforce assets within the West African country recently stand at 4.2 million oz of gold, together with its satellite tv for pc 1.16 million-ounce Napié undertaking.
The corporate says that with $61M in money as of 31 March 2026, it’s well-funded to stay its 14 diamond drill rigs churning out metres.
With the following useful resource replace pencilled in for Q3 and comparable find out about milestones stacking up thru 2026, Aurum seems set to stay the drill bits turning and take care of a thrilling information drift, frequently moulding its Boundiali undertaking into a vital West African gold building tale.
Is your ASX-listed corporate doing one thing fascinating? Touch: mattbirney@bullsnbears.com.au
